DHS Engineering - ETF

 

PutPutBoatEval

Page history last edited by c 1 yr ago

PutPutEval

First two boats

 

Student Name: _______________________________________

 

First boat:

Hull is formed with brake, bent into shape

Boiler works properly, has no holes

Straws are proper length

Boat floats

 

Second boat:

Press formed hull

Boiler works properly

Boiler should have a slightly modified design than the first

Comments (0)

You don't have permission to comment on this page.